New Home at Framing in North Surprise

Published

These two photos are from a new home in north Surprise in October 2026, taken at the framing stage: sheathing on the walls, windows in and the roof trusses still open at the front.

Painting comes late in a new build, but planning for it starts early. This page covers what happens between this stage and the day the paint goes on.

New home at the framing stage with sheathing and windows in north Surprise
New home at the framing stage with sheathing and windows in north Surprise
Project details
ServiceNew construction painting
LocationSurprise, AZ
SurfacesNew-build interior and exterior
Stage shownFraming, sheathing and windows

Where painting fits in a new build

  1. Framing, roofing and windows go in, as in these photos.
  2. Plumbing, electrical and insulation are roughed in and inspected.
  3. Drywall is hung, taped and textured.
  4. Interior primer and paint go on before the finish trades.
  5. Exterior stucco cures, then gets its finish color.
  6. Touch-ups happen after the other trades finish, before the walk-through.
Front of a framed new home on a dirt lot under a cloudy sky in Surprise
Front of a framed new home on a dirt lot under a cloudy sky in Surprise

Why the builder's schedule matters

On a new build, the painter works between other trades. Primer has to go on fresh drywall before cabinets and flooring arrive, and touch-ups come after those trades have been in and out. Keeping in touch with the builder from framing on is what keeps the painting from holding up the move-in date.

Fresh stucco needs time

New stucco is alkaline while it cures, and paint put on too early can fade or fail. The exterior color goes on once the stucco is ready for it, which is one reason the exterior often finishes after the interior.

Before

Front of a framed new home on a dirt lot under a cloudy sky in Surprise
Front of a framed new home on a dirt lot under a cloudy sky in Surprise

More about this service

Frequently asked questions

When should a builder bring in the painter?
As early as framing, so the painting is on the schedule before drywall. The work itself starts once drywall is finished.
Do you work with owner-builders as well as builders?
Yes. We work with general contractors and with homeowners who are running their own build.
Do you paint the exterior of new homes too?
Yes. On a new build we can do the interior, the exterior stucco and the trim, or just the part the builder needs.