Orange Coatings LLC · (602) 932-3417 · Get an estimate

Commercial painting · HOA communities

HOA Community Repaints in the West Valley

Published

We repaint HOA common areas and coordinate community-wide exterior repaints for boards and property managers across the West Valley. That covers perimeter block walls, entry monuments, clubhouses, pool buildings, ramadas, wrought iron fences and gates, and the homes or townhomes an association maintains.

Community work is different from a single house. The colors come from the association's approved scheme, residents still need to get in and out, and the board needs a clear written scope and insurance paperwork before anyone sets up a ladder. Orange Coatings holds Arizona ROC License 365464 and is bonded and insured.

Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting
Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting
Quick facts
ScopeCommon areas, perimeter walls, amenities, association-maintained homes
PaintSherwin-Williams Emerald Exterior, Loxon on bare or patched masonry
PaperworkWritten scope and certificates of insurance for the manager
SchedulingPhased by area to keep amenities open

What an HOA repaint can include

  • Perimeter and interior block walls, including caps and pilasters
  • Entry monuments and sign walls
  • Clubhouse, fitness and pool building exteriors
  • Ramadas, shade structures and pergolas
  • Wrought iron view fences, pool fences and gates
  • Curbs and pool-area concrete coatings where the association wants them
  • Exteriors of townhomes or condos the association maintains

Who we work with

Most HOA projects come to us through a community manager or a board member who sits on the landscaping or architectural committee. Some are small, such as one stretch of sun-faded wall along a busy road. Others cover every wall and amenity in the neighborhood in phases over a season.

We give the manager one written scope that the board can compare against other bids, and we can provide certificates of insurance directly to the management company before we mobilize.

Boards change every year or two, so we keep the written scope plain enough that a new member can read it and understand exactly what was painted, with which product, and why.

Signs your community is due

  • Perimeter walls facing south or west look noticeably lighter than the shaded side
  • Chalky residue rubs off walls and monuments
  • Efflorescence, the white bloom where water wicks into block from sprinklers
  • Rust bleeding at the base of wrought iron pickets and gate hinges
  • Peeling paint on clubhouse fascia and door frames
  • Mismatched touch-ups where past repairs were done in a different color

How a community repaint runs

  1. Walk the property with the manager or committee and list every surface in scope.
  2. Pull the association's approved colors and confirm each Sherwin-Williams match with a sample on site.
  3. Deliver a written quote with a phase plan by area or street.
  4. Agree on resident notices, work hours and where equipment and materials will stage.
  5. Wash, repair cracks, treat efflorescence and rust, and prime bare or patched masonry with Loxon.
  6. Apply two coats of Emerald Exterior, sprayed and back-rolled on block and stucco.
  7. Walk each phase with the manager before moving on, then do a final walkthrough.
Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting
Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting

Colors, approvals and the board's documents

Every association has its own approved scheme and its own process, and we follow the documents your board provides rather than guessing. When the palette is written in another brand's color codes, we cross-match each one to the closest Sherwin-Williams color and confirm it with a sample in daylight, because a wall color that looks right on a chip can read very different on a long run of block.

A community repaint is also a chance to clean up years of patchwork. Recording the exact color codes, sheens and products used on each surface gives the next board and the next contractor an easy reference for touch-ups.

Working around residents and Arizona weather

Walls along sidewalks and amenities people use daily need a plan. We phase work so a pool or clubhouse stays usable, keep walkways clear, and post wet-paint signs where residents walk dogs and kids ride bikes.

Summer heat means early starts, with spraying done before walls heat up in the afternoon sun. Monsoon storms from mid-June through September can bring wind, dust and sudden rain, so exterior coats are timed around the forecast. Sprinklers that soak walls are a common cause of peeling, and we ask the landscaper to adjust heads that hit fresh paint.

How long it takes and what drives the cost

A single wall run or monument can be a few days. A full community with walls, amenities and iron work usually runs in phases over several weeks. The schedule in your written quote reflects the phase plan you approve.

  • Linear feet of wall and total wall height
  • Number of amenity buildings and their trim detail
  • Amount of crack repair, efflorescence and rust treatment
  • Wrought iron footage, which is slow, hand-brushed work
  • Access issues such as landscaping against walls
  • Phasing and work-hour limits set by the board

Communities and cities we serve

We work for associations across the West Valley and greater Phoenix, including:

Photos

Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting
Windows wrapped in plastic, ladder and drop cloth along a siding wall before exterior painting
Lap siding painted light gray with darker gray trim around white-framed windows
Lap siding painted light gray with darker gray trim around white-framed windows
Orange Coatings painter cutting in around a commercial doorway under an exit sign
Orange Coatings painter cutting in around a commercial doorway under an exit sign

Frequently asked questions

Can you bid from our existing reserve study or scope?
Yes. Send the scope or the reserve study line items and we will walk the property against them. If we see surfaces the scope missed, or repairs that should happen before paint, we note them separately so the board can decide.
Do you provide insurance certificates for the management company?
Yes. We are licensed under ROC 365464, bonded and insured, and we can send certificates of insurance directly to the manager before work starts.
How do you handle residents during the work?
We agree on notices, work hours and phase order with the manager up front. Work areas are signed, walkways stay passable, and residents get a clear contact for questions through the manager.
Our approved colors are from another paint brand. Is that a problem?
No. We cross-match each code to the closest Sherwin-Williams color and confirm it with a painted sample on site before the board signs off.
Should walls be repaired before they are repainted?
Yes. Cracks, loose stucco, efflorescence and rusted iron get handled first, and bare or patched masonry gets Loxon primer. Painting over those problems just brings them back within a season or two.
Can the repaint be split over two budget years?
Often it can. Phasing by area or surface type lets the board spread the work out. We can price phases separately so the board can plan around reserves.

Related